Where Faros
either provide a data retrieval service or receive a copy of billing
data from suppliers the 5 highest MD’s report aids with identifying the
maximum load consumed on site. The report assists with deciding how much
additional capacity is required, . The reason for looking at the 5
highest demands (a supplier would only provide the maximum in any one
month) is that the very highest could be a one off and the next four
could be much lower. This would need further investigation as to why
(could be a meter/data glitch) but may indicate the consumption levels
are much lower than a one off figure would suggest. Faros understand
that cost is a major factor when upgrading suppliers; therefore it is
important to identify as close as possible the actual level required.
The customer can then add an amount as a buffer for any potential
increases in the future. |
|